Is Removing Epoxy From Concrete Required Before I Install A New Coating Or Flooring System?

Yes, Removing Epoxy From Concrete should always occur before the installation of a new Coating or Flooring System. The appropriate Floor Preparation before installing the new Coating or Flooring System system is also required.

To install a new Coating or Flooring System, you must ensure the following:
1) The previous Epoxy Coating has been removed
2) All residue from the previous Epoxy Coating has been removed
3) The appropriate floor preparation has been applied
– Concrete Cancer Repairs
– Concrete Crack Repairs
– Concrete Grinding
– Floor Levelling

It is always a MUST that you ensure the above has been completed, to ensure that you get your warranty and to ensure that your new coating or flooring system does not fail. Contractors and companies have the right to not provide you with any warranty on the project if you fail to follow Floor Preparation rules.

Click Here To Learn More About Why Floor Preparation Is Required
Click Here To View Our Removing Epoxy From Concrete Page For More Information
Liquid Flowing Screed - Floor Levelling Sydney - 5

Carpet Removal Sydney (Price Beat Guarantee 2)

FREE PRICE BEAT GUARANTEE

QUOTE


We’ll Beat ALL Quotes By Up To 30%
Conditions apply. *Cannot be used in conjunction with any other offer.

Carpet Removal Services

Flooring Removal & Concrete Grinding Services

CALL US TODAY FOR FAST ASSISTANCE

0424 408 330

OR FILL OUT THIS FORM TO REQUEST A FREE QUOTE

OFFICE LINE

WORKING HOURS

6:00 AM – 10:00 PM