How Long Does Concrete Grinding Take?
Typically, our team can grind floors at a rate of 10 – 40 Square Metres Per Hour.
The time it takes can vary depending on the size of the area, the condition of the concrete and what is being removed. For most residential projects Concrete Grinding projects can be completed within 1-2 days. While larger projects may take longer.
There are important factors to take into consideration that will also dictate how long your job will take, such as:
– The thickness of the coating
– The condition of the concrete
– What equipment we can use on-site
– The size of the area that we are grinding
– How many employees do we have on-site
– What level of power can be supplied on-site
– The condition of the coating that requires removal
The general time length of Concrete Grinding jobs, based on size is:
Jobs that are 0 – 250 square metres will generally be completed in 1 – 7 DAYS or more
Jobs that are 250 – 1,000 square metres or more will generally be completed in 1 – 3 WEEKS or more
Jobs that are 1,000 – 30,000 square metres or more will generally be completed over 1 – 2 MONTHS or more
Jobs that are 30,000 – 100,000 square metres or more will generally be completed over 3 MONTHS or more
Jobs that are 100,000 – 500,000 square metres or more will generally be completed over 3 – 6 MONTHS or more
We specialise in projects from 50 – 500,000 square metres, contact us today for all of your Concrete Grinding needs!