How Long Does Tile Floor Removal Take?
Most Tile Floor Removal jobs can be completed within 1-2 days (depending on the size of the job and the installation method)
Jobs that are 0 – 250 square metres will generally be completed in 1 – 7 DAYS or more
Jobs that are 250 – 1,000 square metres or more will generally be completed in 1 – 3 WEEKS or more
Jobs that are 1,000 – 30,000 square metres or more will generally be completed over 1 – 2 MONTHS or more
Jobs that are 30,000 – 100,000 square metres or more will generally be completed over 3 MONTHS or more
Jobs that are 100,000 – 500,000 square metres or more will generally be completed over 3 – 6 MONTHS or more
We specialise in projects from 50 – 500,000 square metres, contact us today for all of your Tile Floor Removal needs!