How Long Does Removing Epoxy From Concrete Take?
The time it takes can vary depending on the size of the area, the condition of the coating and the type of epoxy being removed. For most residential Removing Epoxy From Concrete projects can generally be completed within 1-2 days. While larger projects may take longer.
Jobs that are 0 – 250 square metres will generally be completed in 1 – 7 DAYS or more
Jobs that are 250 – 1,000 square metres or more will generally be completed in 1 – 3 WEEKS or more
Jobs that are 1,000 – 30,000 square metres or more will generally be completed over 1 – 2 MONTHS or more
Jobs that are 30,000 – 100,000 square metres or more will generally be completed over 3 MONTHS or more
Jobs that are 100,000 – 500,000 square metres or more will generally be completed over 3 – 6 MONTHS or more
We specialise in projects from 50 – 500,000 square metres, contact us today for all of your Removing Epoxy From Concrete needs!